Ever Wonder What The Procedures Are Like For Demolishing Steel Structure And Buildings?

Step 1. A brief summary for the to be demolished building and surrounding environment

Step 2. It is necessary to focus on the type of structure of the demolished building, the force of each part of the structure, with a diagram, and introduce the infill wall, partition wall, decoration practices, water, electricity, heating, gas equipment, surrounding houses, roads And pipeline related conditions. The situation described must be the current situation. It can be represented by the current situation plan.

Step 3. Construction preparation work plan: All preparations (including organization technology, site, equipment materials, labor preparation) should be listed, planned, and implemented. List the list of organizational leaders and the division of labor

Step 4. Demolition method + According to the actual situation and the requirements of Party A, compare various demolition methods and choose a safe, economical, fast, and small method of disturbing the people. The entire content of the demolition method should be described in detail, and the blasting and detonation methods should be specified in detail. Safety distance, warning range, protection methods, damage, direction and extent of collapse, and safety technical measures.

Step 5. Construction deployment and schedule.

Step 6. Workforce organization.

Step 7. A list of machinery, equipment, tools, materials, and plans.

The Planning Phase

The construction plan is the basis for all work arrangements at the construction site and is also the basis for construction preparation work. The following should be included:

1)  the layout and size of the demolished buildings and surrounding buildings and various pipelines, obstacles, roads on the ground and underground.

2) Lifting lines and transport roads for lifting equipment. +

3) Location, size and practices of temporary warehouses for blasting materials and other dangerous goods. +

4) Various machinery, equipment, materials and the layout of the demolished building materials.

5) The direction and extent of the dumped building and the range of the warning zone shall be marked with the location size.

6) Indicate the construction water, electricity, office, safety facilities, fire hydrant position and size.

7) Safety technical measures + For the selected demolition methods and site conditions, comprehensive safety technical measures are proposed in accordance with relevant regulations.